
Construction of the 35 Michigan building

35 Michigan after construction
On September 24, 2011, Spectrum Health Laboratory undertook a major change and moved the laboratory from Butterworth and Blodgett to a new space on the 6th and 7th floors of 35 Michigan.
The model changed from a two-lab system to a Core Lab at 35 Michigan (Spectrum Health Regional Laboratory) and an immediate response laboratory at Blodgett, creating what are affectionately known as SHRL and BIRL.
In addition to this major change, the lab implemented automation, increasing productivity and decreasing time to result.